The leading steel pipes manufacturing company located in NCR has four production units in different locations in the country. They have been finalizing their transportation contracts through manual Auction and subsequent manual negotiations. As the company has a large number of destinations, it was taking a lot of time to finalize the transportation contracts. The company requested for RA of transportation for one production unit as a sample to see the results of transportation E-Auction.
SP ensured record participation of 25 bidders in addition to existing bidders in RA of the company. As a result of fierce competition, RA achieved saving of 5% to 11% in transportation rates in comparison to existing rates. Satisfied with the result of first RA, the company has introduced RA for transportation of other production units, thereby also achieving substantial savings.
Conclusion:
Typical results of a RA are presented for reference and information with the message that RA is very strong and proven tool to optimize transportation costs.
Sl. No. |
Destinations From---to--- |
Type of Truck
(FLT)
(Ton capacity)
|
Existing rates
(Rs. per Ton)
|
Rates achieved in the RA
(Rs. per Ton)
|
% of Saving |
1 |
Sikandrabad to Hisar (Haryana) |
22 Ton |
810 |
715 |
11.72% |
2 |
Sikandrabad to Bangalore(Ktk) |
20 Ton |
4880 |
4350 |
10.86% |
3 |
Sikandrabad to Pune (Maharastra) |
20 Ton |
2750 |
2610 |
5.09% |
4 |
Sikandrabad to Surat (Gujrat) |
22 Ton |
1762 |
1632 |
7.37% |
5 |
Sikandrabad to Baddi
(H.P)
|
20 Ton |
890 |
835 |
6.17% |